![]() |
![]() |
|
Home
Remediation Capabilities
Equipment Photographs
Technical Specifications
Extraction Process
Groundwater Extraction
Flow Diagram
Permits
Standard Pricing
Comparisons with SVE Systems Advantages Recommendations Standard Rate Schedule Update Presentations to UST Cleanup Fund Contact Us |
Case Study
Scope:
CalClean was contracted to conduct a 24-hour dual phase extraction pilot test for a confidential client located within the Regional Water Quality Control Board - Santa Ana Region. The subject site exhibited elevated concentrations of petroleum hydrocarbons in the soil and groundwater beneath the site including the oxygenated gasoline additives methyl tert-butyl ether (MtBE) and tert-amyl methyl ether (TAME).
The lithology beneath the site consisted of sand/silty sand (0-15 feet below ground surface [bgs]), clayey silt/silty clay (15-55 feet bgs), and sand/gravelly sand (>55 bgs). Shallow groundwater was located in a thin saturated zone approximately 24 feet bgs.
Results:
The results of the dual phase extraction pilot test indicated an effective radius of influence of approximately 29 feet. Approximately 495 pounds of hydrocarbons were destroyed and extracted groundwater was treated utilizing CalClean’s dual phase system and groundwater treatment trailer. The results of the groundwater samples are presented in Table 1.
Case Study
|
![]() |
![]() |